WHAT WE HAVE BEEN WORKING ON

Public Participation Process
Description: Public participation Process for the Integrated Waste Management By-Laws and Integrated Waste Management Plan for City of Ekurhuleni in terms of Public Participation Guidelines as per the National Environmental Management Act; 1998 Environmental Impact Assessment Regulations and section 17 and 21 of the Local Government: Municipal Systems Act; 2000 as per specifications
Year Started: 2018
Role: Project Leader and Environmental Assessment Practitioner (EAP)
Tasks: Undertake Public participation Process for the Integrated Waste Management By-Laws and Integrated Waste Management Plan for City of Ekurhuleni in terms of Public Participation Guidelines as per the National Environmental Management Act; 1998 Environmental Impact Assessment Regulations and section 17 and 21 of the Local Government: Municipal Systems Act; 2000 as per specifications
Status: Completed
Bulk Services Part 2 Amendment Application
Description: PRASA Plant Bulk Services Amendment Applications
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Water Use License and Environmental Authorisation Amendment Applications
Status: Completed
Environmental services until 2022
Description: Undertake Environmental Assessment Activities in the City of Ekurhuleni, for contract PS-WS 31/2019, for a period of 2 years.
Year Started: 2020
Role: Project Leader and Project Manager
Tasks: Integrated Environmental Management Services – EAP
Status: Completed
Undertake Environmental Activities in the City of Ekurhuleni on an as and when required basis from date of award until 30 June 2026
Description: Undertake Environmental Activities in the City of Ekurhuleni on an as and when required basis from date of award until 30 June 2026
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Undertake Environmental Activities in the City of Ekurhuleni
Status: Ongoing

Kiepersol – Jackal Creek EIA
Description: Environmental Impact Assessment for the proposed Kiepersol – Jackal Creek Filling Station
Year Started: 2018
Role: Overall Project Manager and Environmental Assessment Practitioner (EAP)
Tasks: Undertake Environmental Authorisation (EA) Application process for the Jackal Creek/ Kiepersol filling station
Status: Completed
Sewer Pipeline BA and WULA
Description: BA and WULA for Abland’s Sewer Pipeline: BA and WULA, Gauteng, South Africa
Year Started: 2016
Role: Project Leader and Project Manager
Tasks: Undertake Basic Assessment (BA) and Water Use License Application (WULA)
Status: Completed
Sewer Pipeline Environmental Control Officer
Description: Environmental Control Officer (ECO) for Abland’s Sewer Pipeline: ECO Services
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Undertake ECO services
Status: Completed
Mixed Use Development GA Application
Description: General Authorisation Application for Abland’s proposed Mixed Use Development: Construction of an Industrial 1/ Mixed Use Development
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Undertake General Authorisation- WULA
Status: Completed
Sandton Gate General Authorisation
Description: Sandton Gate Basic Assessment and General Authorisation
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Undertake a BA and GA Application processes for the proposed Sandton Gate Precinct
Status: Completed

EA and WUL amendments
Description: 201810 Abland Sewer Amendments
Year Started: 2018
Role: Project Leader and Environmental Assessment Practitioner (EAP)
Tasks: Undertake environmental authorisation and water use liscense (WUL) amendment application processes for the proposed sewer pipeline crossingthe Natal Spruit
Status: Completed
Sandton Gate EA Amendment and WULA
Description: Sandton Gate EA Amendment and WULA
Year Started: 2018
Role: Project Manager and EAP
Tasks: Undertake Environmental Authorisation (EA) Amendment (Part 2) and Water Use License (WUL) Application processes for the proposed diversion and decommissioning of an existing sewer pipeline along the proposed Sandton Gate Precinct Boundary
Status: Completed
BA and WULA for wetland Rehabilitation and Sewer Pipeline
Description: Abland Sewerline 2 and Wetland Rehabilitation
Year Started: 2019
Role: Project Manager
Tasks: Undertake Environmental Authorisation (EA) and Water Use License Application (WULA) processes for the proposed Sewer Pipeline and rehabilitation of the wetland system
Status: Completed
Sandton Gate ECO Services
Description: ECO Services
Year Started: 2019
Role: Lead ECO
Tasks: Undertake ECO Audits
Status: Completed

Environmental Monitoring
Description: Wetland, water and air quality monitoring, and aquatic biomonitoring for the PRASA Manufacturing Plant and the associated bulk services for a period of approximately two (2) years.
Year Started: 2018
Role: Project Leader and Environmental Assessment Practitioner (EAP)
Tasks: Undertake Environmental Monitoring (Wetland, water and air quality monitoring, and aquatic biomonitoring) for the PRASA Manufacturing Plant and the associated bulk services for a period of approximately two (2) years.
Status: Completed
Drinking Water Quality Monitoring
Description: Drinking water quality monitoring for the Passenger Rail Agency of South Africa (PRASA) Manufacturing Plant
Year Started: 2018
Role: Project Leader and Environmental Assessment Practitioner (EAP)
Tasks: Undertake drinking water quality monitoring for the Passenger Rail Agency of South Africa (PRASA) Manufacturing Plant for a period of approximately one (1) month
Status: Completed
PRASA Plant and Bulk Services WULs Audit
Description: PRASA Plant and Bulk Services WULs Audit
Year Started: 2021
Role: Project Leader and Project Manager
Tasks: Undertake WULs Audit for the PRASA Plant and Bulk Services
Status: Completed
Part1 and WUL amendments
Description: PRASA Plant Manufacturing Park Part1 and WUL amendments M02 and M05
Year Started: 2020/1
Role: Project Leader and Project Manager
Tasks: Undertake Park Part1 and WUL amendment Applications
Status: Completed
PRASA Plant Phase 3 – Part 2 Amendment and General Authorisation
Description: PRASA Plant Phase 3 – Part 2 Amendment and General Authorisation
Year Started: 2022
Role: Project Leader and Project Manager
Tasks: Undertake Part 2 Amendment and General Authorisation processes
Status: Completed

Asbestos Inventory and WMP Update
Description: Asbestos Inventory and Waste Management Plan Update for Assmang Manganese- Black Rock Mine Operations.
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Asbestos Inventory and Waste Management Plan Update
Status: Completed
EMPr Performance Assessment
Description: Environmental Management Programme Performance Assessment Report
Year Started: 2018
Role: Project Leader and Project Manager
Tasks: BIENNIAL ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPR) PERFORMANCE ASSESSMENT FOR BLACK ROCK MINE OPERATIONS (BRMO) SITUATED WITHIN THE NORTHERN CAPE PROVINCE
Status: Completed
WUL and GN704 Audit
Description: Water Use License and GN 704 Audit Assmang Manganese
Year Started: 2019
Role: Project Manager
Tasks: Undertake Water Use License and GN 704 Audit for Assmang Manganese
Status: Completed
WUL and GN 704 Compliance Audit Reports
Description: WUL and GN 704 Compliance Audit Reports
Year Started: 2021
Role: Project Leader and Project Manager
Tasks: Undertake WUL and GN 704 Compliance Audits
Status: Completed
BMRO EMPr Performance Assessment and WUL Audit 2023
Description: BMRO EMPr Performance Assessment and WUL Audit 2023
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Undertake EMPr Performance and WUL Audit for 2023
Status: Completed

Financial Provisions Update
Description: Financial Provisions Update 2017
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Update Aquarella Investments 389 (Pty) Ltd Financial Provisions
Status: Completed
Cyferfontein Mining Right Application
Description: Mining Right Application
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Mining Right Application- Scoping and Environmnetal Impact Reporting
Status: Completed
PAR and Rehabilitation Financial Provisions
Description: Financial Provisions, Performance Assessments and Annual Rehabilitation Plans
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Update Financial Provisions, compile Performance Assessment Reports and Annual Rehabilitation Plans for six (6) clay quarries i.e. Steelpark 1, Steelpark 2, Leeuwkuil, Boekenhoutskloof, Syferfontein and Cyferfontein within the Gauteng Province
Status: Completed
Driefontein Mining Right Application

Mining Closure Plan
Description: Mining Closure Plan Addendum
Year Started: 2016
Role: Project Leader and Project Manager
Tasks: Compilation of an Addendum to the approved Mine Closure Plan
Status: Completed
WML Certificate Application
Description: Waste Storage Certifcate Application: Construction of a Waste Storage Facility for the storage of hazardous waste
Year Started: 2016
Role: Project Leader and Project Manager
Tasks: Undertake Waste Storage Certifcate Application process
Status: Completed

BA and GA Applications
Description: Johannesburg Development Agency (JDA) Sports and Park areas Basic Assessment (BA) and General Authorisation (GA)
Year Started: 2018
Role: Project Leader and Project Manager
Tasks: Undertake Basic Assessment (BA) and General Authorisation (GA) Application Processes for the proposed Sports and Park areas in Diepsloot. Diepsloot Pedestrian Node Upgrade
Status: Ongoing
JB Marks Road BA and WULA
Description: JB Marks Road Upgrade BA and WULA
Year Started: 2021
Role: Project Leader and Project Manager
Tasks: Undertake Basic Assessment and WUL amendment Applications
Status: Ongoing

PRASA Plant Process Water Testing
Description: PRASA Plant Process Water Testing
Year Started: 2021
Role: Project Leader and Project Manager
Tasks: Undertake PRASA Plant Process Water Testing
Status: Completed
PRASA Plant Manufacturing Park Part1 and WUL amendments
Description: PRASA Plant Manufacturing Park Part1 and WUL amendments M02 and M05
Year Started: 2020
Role: Project Leader and Project Manager
Tasks: Undertake Park Part1 and WUL amendment Applications
Status: Completed

Rehabilitation of the Boksburg Lake
Description: Rehabilitation of the Boksburg Lake
Year Started: 2021
Role: Project Leader and Project Manager
Tasks: ECO for the rehabilitation of the Boksburg Lake
Status: Ongoing
BA and WULA for the Klipriviersberg Nature Reserve (KNR) upgrade and rehabilitation along the stream
Description: BA and WULA for the Klipriviersberg Nature Reserve (KNR) upgrade and rehabilitation along the stream
Year Started: 1 October 2022
Role: Project Leader and Project Manager
Status: Ongoing

South Deep JV EMPrs Performance Assessments 2020
Description: South Deep JV EMPrs Performance Assessments 2020
Year Started: 2020
Role: Project Leader and Project Manager
Tasks: Undertake EMPRs Performance Assessments
Status: Completed
South Deep JV EMPrs Performance Assessments and EA Audit 2022
Description: South Deep JV EMPrs Performance Assessments and EA Audit 2022
Year Started: 2022
Role: Project Leader and Project Manager
Tasks: Undertake EMPRs Performance Assessments and EA Audit
Status: Completed
South Deep JV Water Use License Application (WUL)
Description: South Deep JV Water Use License Application (WUL)
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Undertake Water Use License (WUL) Amendment Application for 2023
Status: Ongoing
South Deep JV to undertake an Environmental Impact Assessment (EIA) for Diesel Tanks at Met Plant
Description: South Deep JV to undertake an Environmental Impact Assessment (EIA) for Diesel Tanks at Met Plant
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: Undertake an Environmental Impact Assessment for Diesel Tanks at Met Plant
Status: Ongoing
South Deep JV Water Use License (WUL) External Audit
Description: South Deep JV Water Use License (WUL) External Audit
Year Started: 2025
Role: Project Leader and Project Manager
Tasks: Water Use License (WUL) Audit
Status: Ongoing

Monte Place at Monte Casino Commercial Development
Description: Monte Place at Monte Casino Commercial Development
Year Started: 2021
Role: Project Leader and Project Manager
Tasks: Undertake a General Authorisation Application
Status: Completed

Samancor Metalloys Integrated Performance Assessment
Description: Samancor Metalloys Integrated EMPr, approvals performance Assessment
Year Started: 2020
Role: Project Leader and Project Manager
Tasks: Undertake EMPr, approvals performance Assessment
Status: Completed

Financial Provisions Update
Description: Financial Provisions Update 2016
Year Started: 2016
Role: Project Leader and Project Manager
Tasks: Update Ceramics Industries Limited Financial Provisions for the year 2016
Status: Completed

Noise Survey
Description: 201832 KEM JV Noise Survey
Year Started: 2018
Role: Project Leader
Tasks: Undertake Noise Survey/ Monitoring as per the conditions of the approves EMPr
Status: Completed

Jozi Trails BA and GA
Description: BA and GA application processes
Year Started: 2019
Role: Project Leader and Project Manager
Tasks: Undertake Basic Assessment and General Authorisation Applications
Status: Ongoing

De Beers Geology Pit Closure
Description: De Beers Geology Pit Closure
Year Started: 2021
Role: Project Leader and Project Manager
Tasks: Undertake a Closure Certificate Application process for a geology pit
Status: Ongoing


GA Application
Description: Rembrandt Development General Authorisation Application
Year Started: 2017
Role: Project Leader and Project Manager
Tasks: Undetake a General Authorisation Application
Status: Completed

Albert's Farm ECO Services project
Description: ECO Services
Year Started: 2021
Role: Lead ECO
Tasks: Undertake ECO Audits
Status: Completed

Bulk Water Supply Bapong and Modderspruit Villages BA and WULA
Description: Bulk Water Supply Bapong and Modderspruit Villages Basic Assessment and Water Use License Application
Year Started: 2022
Role: Project Leader and Project Manager
Tasks: Undertake BA and WULA
Status: Ongoing

EMPr, EA and WML Amendments - Scoping and Environmental Impact Reporting – Tailings Storage Facility (TSF3)
Description: Environmental Management Programme, Environmental Authorisation and Waste Management License amendment application – Scoping and Environmental Impact Reporting
Year Started: 2022
Role: Project Leader and Project Manager
Tasks: Undertake Scoping and Environmental Impact Reporting process
Status: Ongoing
EMPr, EA and WML Amendments – BA and WULA for TSF2 and TSF 2 Extension
Description: EMPr, EA and WML Amendments – BA and WULA for TSF2 and TSF 2 Extension
Year Started: February 2023
Role: Project Leader and Project Manager
Status: Ongoing
EMPr, EA and WML Amendments – S&EIR for Underground Mining
Description: EMPr, EA and WML Amendments – S&EIR for Underground Mining
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Tharisa mine EMPr, EA and WML Amendments – S&EIR for Underground Mining
Status: Ongoing
Dust Dispersion Modelling
Description: Dust Dispersion Modelling
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: Dust Dispersion Modelling
Status: Ongoing
Independent Environmental Assessment Practitioner for a period of 3 years
Description: Independent Environmental Assessment Practitioner for a period of 3 years
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: Undertake Various Environmental Services
Status: Ongoing

Independent Environmental Assessment Practitioner (EAP) to Undertake an Environmental Authorisation (EA) process for the consolidation and amendment of the various Environmental Management Programmes (EMPrs)
Description: Independent Environmental Assessment Practitioner (EAP) to Undertake an Environmental Authorisation (EA) process for the consolidation and amendment of the various Environmental Management Programmes (EMPrs)
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: Undertake an Environmental Authorisation (EA) process for the consolidation and amendment of the various Environmental Management Programmes (EMPrs) granted
Status: Ongoing
Annual Integrated Water and Waste Management Plan (IWWMP) and Rehabilitation Implementation Strategy Plan (RSIP) Update
Description: Annual Integrated Water and Waste Management Plan (IWWMP) and Rehabilitation Implementation Strategy Plan (RSIP) Update
Year Started: 2025
Role: Project Leader and Project Manager
Tasks: Annual Integrated Water and Waste Management Plan (IWWMP) and Rehabilitation Implementation Strategy Plan (RSIP) Update.
Status: Ongoing
Auditing of implementation of MOS Rehabilitation Plan
Description: Auditing of implementation of MOS Rehabilitation Plan
Year Started: 2025
Role: Project Leader and Project Manager
Tasks: Auditing of implementation of MOS Rehabilitation Plan
Status: Ongoing

Orange Farm Sports Complex BA and WULA
Description: Orange Farm Sports Complex Basic Assessment and General Authorisation
Year Started: 2022
Role: Project Leader and Project Manager
Tasks: Undertake BA and WULA
Status: Ongoing

Vlakplaats Sewer Pipeline Basic Assessment & Water Use License Application
Description: Vlakplaats Sewer Pipeline Basic Assessment and Water Use License Application
Year Started: 2022
Role: Project Leader and Project Manager
Tasks: Undertake BA and WULA
Status: Ongoing

Pintail, Bakerton and Grootvlei BA and WULA
Description: Pintail, Bakerton and Grootvlei Basic Assessment and Water Use License Application
Year Started: 2022
Role: Project Leader and Project Manager
Tasks: Undertake Basic Assessment and Water Use License Application
Status: Ongoing

Olifantsvlei Cemetery Environmental Control Officer Services
Description: Olifantsvlei Cemetery Environmental Control Officer Services
Year Started: 12 September 2022
Role: Project Leader and Project Manager
Status: Ongoing
Kloofendal Nature Reserve Environmental Control Officer Services
Description: Kloofendal Nature Reserve Environmental Control Officer Services
Year Started: 12 September 2022
Role: Project Leader and Project Manager
Status: Ongoing
Johannesburg Botanical Gardens Environmental Control Officer Services
Description: Johannesburg Botanical Gardens Environmental Control Officer Services
Year Started: 16 September 2022
Role: Project Leader and Project Manager
Status: Ongoing

Boksburg Lake Rehabilitation Environmental Control Officer Services
Description: Boksburg Lake Rehabilitation Environmental Control Officer Services
Year Started: January 2022
Role: Project Leader and Project Manager
Status: Completed

Arxo Metals Air Emissions License (AEL) Application – Scoping and Environmental Impact Reporting (S&EIR)
Description: Arxo Metals Air Emissions License (AEL) Application – Scoping and Environmental Impact Reporting (S&EIR)
Year Started: 15 November 2022
Role: Project Leader and Project Manager
Status: Completed
Public Participation Process For Brits Smelter Plant
Description: Public Participation Process For Brits Smelter Plant
Year Started: 2025
Role: Project Leader and Project Manager
Tasks: Public Participation Process
Status: Ongoing

Undertake Environmental Screening, Environmental Impact Assessment (EIA) process and Specialists studies for the Multi – Purpose Reactor (MPR) project
Description: Undertake Environmental Screening, Environmental Impact Assessment (EIA) process and Specialists studies for the Multi – Purpose Reactor (MPR) project
Year Started: 28 February 2023
Role: Project Leader and Project Manager
Status: Ongoing

Vula Oil Randfontein Depot Facility BA
Description: Vula Oil Randfontein Depot Facility BA
Year Started: 2023
Role: Project Manager and EAP
Tasks: Undertake Environmental Authorisation (EA) Application process for the Randfontein Depot Facility
Status: Ongoing
Decommissioning and Rehabilitation Plan and Comprehensive Report at Randfontein Depot Facility
Description: Decommissioning and Rehabilitation Plan and Comprehensive Report at Randfontein Depot Facility
Year Started: 2025
Role: Project Leader and Project Manager
Tasks: Decommissioning and Rehabilitation Plan and Comprehensive Report
Status: Ongoing

Zuikerbosch Water treatment plant and Panfontein water treatment residues (Panfontein sludge disposal site) WUL and Permits Audits for 2023. Environmental compliance audits
Description: Zuikerbosch Water treatment plant and Panfontein water treatment residues (Panfontein sludge disposal site) WUL and Permits Audits for 2023. Environmental compliance audits
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Undertake Water Use License (WUL) and permits Audit
Status: Completed

Environmental Studies Screening Report for Commonage Housing Development
Description:Environmental Studies Screening Report for Commonage Housing Development
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Environmental Studies Screening Report for Commonage Housing Development
Status: Ongoing

Environmental File
Description: Environmental File
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Environmental File
Status: Completed

S&EIR and WULA for the proposed sand mine
Description: S&EIR and WULA for the proposed sand mine
Year Started: 2023
Role: Project Leader and Project Manager
Tasks: Undertake S&EIR and WULA
Status: Ongoing

EA & EMPr monthly external ECO Audits for 3 Shaft
Description: EA & EMPr monthly external ECO Audits for 3 Shaft
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: 3 Shaft EMPr and EA ECO External Audits
Status: Ongoing

North Mine WUL and Associated Documents Audit
Description: North Mine WUL) and Associated Documents Audit
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: North Mine WUL and Associated Documents Audit
Status: Completed
South Mine Water Use License Audit
Description: South Mine Water Use License Audit
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: South Mine Water Use License Audit
Status: Completed
Undertake an update of the Integrated Water and Waste Management Plan (IWWMP) and Rehabilitation Implementation Strategy Plan (RSIP)
Description: Undertake an update of the Integrated Water and Waste Management Plan (IWWMP) and Rehabilitation Implementation Strategy Plan (RSIP)
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: Integrated Water and Waste Management Plan (IWWMP) and Rehabilitation Implementation Strategy Plan (RSIP) for South Mine and North Mine
Status: Ongoing
South Mine Water Use Licence (Internal Audit)
Description: South Mine Water Use Licence (Internal Audit)
Year Started: 2025
Role: Project Leader and Project Manager
Tasks: WUL Internal Audit
Status: Ongoing

Undertake EIA’s application, EA permits and license. Development & Implementation of environmental Master plan, Archaeological surveys. Providing Management and Monitoring services for a period of 3 years.
Description: Undertake EIA’s application, EA permits and license. Development & Implementation of environmental Master plan, Archaeological surveys. Providing Management and Monitoring services for a period of 3 years.
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: Environmental Management Services
Status: Ongoing

Section 24G and Water Use Licence Application (WULA)-General Authorisation (GA) For Ngatia Trading
Description: Section 24G and Water Use Licence Application (WULA)-General Authorisation (GA) For Ngatia Trading
Year Started: 2024
Role: Project Leader and Project Manager
Tasks: Section 24G and WULA-GA
Status: Ongoing

Undertake Environmental Assessment Activities for the refurbishment/upgrade of Vlakplaats Waste Water Treatment Works (WWTW)
Description: Undertake Environmental Assessment Activities for the refurbishment/upgrade of Vlakplaats Waste Water Treatment Works (WWTW)
Year Started: 2025
Role: Project Leader and Project Manager
Tasks: Undertaking a Basic Assessment (BA) – Waste Management License (WML) And Water Use License (WUL) Application process for the proposed refurbishment/upgrade of Vlakplaats Waste Water Treatment Works (WWTW).
Status: Ongoing